Difference between revisions of "Minutes-11-11-2010"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
  
 
# Production (David)
 
# Production (David)
#* Blue Crab status  
+
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch]
 
#* Frame lamination
 
#* Frame lamination
 +
#* Production plan
 
# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)
#* Update on PCBs: [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination1.jpg delaminated PCB1] and [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination2.jpg PCB2]
+
#* Update on PCB inspection
#* Cathode foil and rigid-flex procurement
+
#* Other
#* Cathode foil inspection plan
+
#* Cathode foil production
 +
#* Rigid-flex procurement
 
# Engineering (Bill, David)
 
# Engineering (Bill, David)
#* Wire stringing status; position measurement system.  
+
#* Wire stringing status; stepper motor controller.  
 
#* Other
 
#* Other
 
# Full-scale prototype tests
 
# Full-scale prototype tests
#* status, timing with fADC125 (Beni)[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 535]
+
#* timing with fADC125 (Beni)
#* wire offset studies (Lubomir)[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 534 and 536]
+
#* cathode resolution studies (Simon and Lubomir)[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-538]
 
# Other
 
# Other
  

Revision as of 18:00, 10 November 2010

November 11, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status sketch
    • Frame lamination
    • Production plan
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCB inspection
    • Other
    • Cathode foil production
    • Rigid-flex procurement
  3. Engineering (Bill, David)
    • Wire stringing status; stepper motor controller.
    • Other
  4. Full-scale prototype tests
  5. Other