Difference between revisions of "Minutes-10-31-2013"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
# Installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf]
 
# Installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf]
 
#* FDC survey and rail alignment (Tim, Bill)[http://www.jlab.org/Hall-D/detector/fdc/installation/FDCinHall.csv Survey results_1], [http://www.jlab.org/Hall-D/detector/fdc/installation/Prelim_Report_FDC_Inspection_131031.xlsx Survey results_2]
 
#* FDC survey and rail alignment (Tim, Bill)[http://www.jlab.org/Hall-D/detector/fdc/installation/FDCinHall.csv Survey results_1], [http://www.jlab.org/Hall-D/detector/fdc/installation/Prelim_Report_FDC_Inspection_131031.xlsx Survey results_2]
 +
#* FDC installation on platform: [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_1.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_2.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_3.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_4.JPG]
 
# Engineering (Bill)
 
# Engineering (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)

Revision as of 17:25, 31 October 2013

October 31, 2013 FDC meeting

Agenda

  1. Installation [1]
  2. Engineering (Bill)
  3. Electronics (Chris, Nick)
  4. Tests in EEL126 FDC E-log (Beni)
    • New F1TDC
  5. Other