- The results from the survey of the FDC on the floor in the Hall are attached (still preliminary). The main conclusions: flatness of all the packages is OK (max deviation  
+
- The results from the survey of the FDC on the floor in the Hall are attached (still preliminary). The main conclusions: flatness of all the packages is OK (max deviation from the best fitted plane is 0.022"=0.56 mm). The centering of all the packages is perfect. The main concern is that the tilt (pitch and yaw) of the packages changed if compared to the Blue Crab measurements. 
  
 
== Engineering ==
 
== Engineering ==

Revision as of 16:30, 31 October 2013

October 31, 2013 FDC meeting

Agenda

  1. Installation [1]
  2. Engineering (Bill)
  3. Electronics (Chris, Nick)
  4. Tests in EEL126 FDC E-log (Beni)
    • New F1TDC
  5. Other