Difference between revisions of "Minutes-10-18-2012"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_October_18_2012.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_October_18_2012.xlsx Construction Tracking] (Dave)
 
# Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Vlad)
 
# Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Vlad)
# Engineering (Bill)
+
# Engineering [http://www.jlab.org/Hall-D/detector/fdc/documents/HEADER-BALENCING-REPORT-fluorinert.pdf Ansys analyses of the cooling] (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 18:35, 18 October 2012

October 11, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Corrosion tests (Vlad)
  3. Engineering Ansys analyses of the cooling (Bill)
  4. Electronics (Chris, Nick)
  5. Third package tests FDC E-log (Beni)
  6. Other