Difference between revisions of "Minutes-10-13-2011"

From GlueXWiki
Jump to: navigation, search
(Engineering)
Line 25: Line 25:
 
- Bill has drawings of many parts and tools ready, but we can't use the FDC account now. The new hubs will make the installation easier and will prevent from damaging the frames, therefore everybody agrees we need them urgently. During the meeting Eugene got permission to spend $17K for their production. We can start stacking the second package using the metal pins/hubs from the prototype since they are shorter and then replace them when we have the new hubs.   
 
- Bill has drawings of many parts and tools ready, but we can't use the FDC account now. The new hubs will make the installation easier and will prevent from damaging the frames, therefore everybody agrees we need them urgently. During the meeting Eugene got permission to spend $17K for their production. We can start stacking the second package using the metal pins/hubs from the prototype since they are shorter and then replace them when we have the new hubs.   
  
- Curtis Mayer gave us samples gluing Rohacell with aluminized mylar using three different Scotch Weld Epoxies: 1838 B/A (the one that we use), DP190 and DP460NS, demonstrating increasing adhesive power in this order. We are Scotch Weld with mylar, but Bill wants to try using DP460NS for gluing the mylar on the end window and probably on the cathodes. Now we use Epon at these places.  
+
- Curtis Mayer gave us samples gluing Rohacell with aluminized mylar using three different Scotch Weld Epoxies: 1838 B/A (the one that we use), DP190 and DP460NS, demonstrating increasing adhesive power in this order. We are not using Scotch Weld with mylar, but Bill wants to try using DP460NS for gluing the mylar on the end window and probably on the cathodes. Now we use Epon at these places.
  
 
== Electronics ==
 
== Electronics ==

Revision as of 15:57, 14 October 2011

October 13, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • First package tests (Lubomir)
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Testing set-up at EEL126 (Beni)
  5. Other

Minutes

Participants: Eugene, Bill, Dave, Chris, Simon, Beni, Vladimir, Mark, and Lubomir.

Production

- Dave: First package is fully assembled as of yesterday. Now working on the second package. The first cathode (type-3) is ready. Working also at another two cathodes and two end windows together in order to save conductive epoxy. There was a problem with the first wire frame when replacing the HV caps. The first replacement resulted in somewhat elevated leakage currents and it was decided to replace them once more. After the caps were removed it turned out many many of their pads delaminated. We will continue the production with the next wire frame that was already laminated while trying to fix this one. Bill says somebody from the electronics group already fixed delaminated traces on a frame before.

- Lubomir: Full first package running with gas since Wednesday evening. Leakage very low: bubbling at 35 ccpm. Will start testing today evening or on Friday. Valdimir tested the five cells before and found one problem: on one of the newly installed cathodes (type-1) on the top of cell#4, one flex delaminated completely from the cathode. All the conductive tape was on the cathode and nothing on the flex which is not normally what we see. Suspect the gluing temperature was not correct. Also the kapton tape that we put on the top of the flex/cathode was covering mostly the flex area and it may have lost adhesion to the cathode during cathode installation due to g10 deformation. In several cases when we had to remove the rigid-flex from the cathode pieces of conductive tape remain on both sides. The flex was glued again and the cathode installed at the same place. Now with all the six cells in the package Vladimir will test all the planes above and including this cathode since all these were either re-installed or never tested.

Engineering

- Bill has drawings of many parts and tools ready, but we can't use the FDC account now. The new hubs will make the installation easier and will prevent from damaging the frames, therefore everybody agrees we need them urgently. During the meeting Eugene got permission to spend $17K for their production. We can start stacking the second package using the metal pins/hubs from the prototype since they are shorter and then replace them when we have the new hubs.

- Curtis Mayer gave us samples gluing Rohacell with aluminized mylar using three different Scotch Weld Epoxies: 1838 B/A (the one that we use), DP190 and DP460NS, demonstrating increasing adhesive power in this order. We are not using Scotch Weld with mylar, but Bill wants to try using DP460NS for gluing the mylar on the end window and probably on the cathodes. Now we use Epon at these places.

Electronics

- Chris: