Difference between revisions of "Minutes-10-11-2012"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* First package assembly  
 
#* First package assembly  
 
# Corrosion test [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf results] (Vlad)
 
# Corrosion test [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf results] (Vlad)
# Engineering (Bill)
+
# Engineering [http://www.jlab.org/Hall-D/detector/fdc/documents/tcu40-80.pdf temperature control unit](Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 17:32, 11 October 2012

October 11, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • First package assembly
  2. Corrosion test results (Vlad)
  3. Engineering temperature control unit(Bill)
  4. Electronics (Chris, Nick)
  5. Third package tests FDC E-log (Beni)
  6. TDR, pages 132-146 (Lubomir)
  7. Other