Difference between revisions of "Minutes-1-6-2011"
From GlueXWiki
Line 10: | Line 10: | ||
#* Rigid-flex inspection | #* Rigid-flex inspection | ||
#* Cathode foil production | #* Cathode foil production | ||
− | #* Foil inspection | + | #* Foil inspection [http://www.jlab.org/Hall-D/detector/fdc/reports/Cathode_Foil_Inspection_Report_bills.docx report] |
#* Other | #* Other | ||
# Engineering (Bill, David, Lubomir) | # Engineering (Bill, David, Lubomir) |
Revision as of 13:31, 5 January 2011
December 16, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status picture before X-mas
- ETC change request for FDC Tim's last schedule
- Electronics (Fernando, Chris, Roger)
- PCB inspection
- Rigid-flex inspection
- Cathode foil production
- Foil inspection report
- Other
- Engineering (Bill, David, Lubomir)
- Full-scale prototype (Lubomir)
- Studies with methane admixture FDC Log Book, page 545
- Other