Difference between revisions of "Minutes-1-6-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 4: Line 4:
  
 
# Production (David)
 
# Production (David)
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/pictures/Dsc05425_2.jpg]
+
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/pictures/Dsc05425_2.jpg picture befor X-mas]
 
#* ETC change request for FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/ETC_FDC_Tims_budget.pdf Tim's last schedule]
 
#* ETC change request for FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/ETC_FDC_Tims_budget.pdf Tim's last schedule]
 
# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)

Revision as of 13:27, 5 January 2011

December 16, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
  2. Electronics (Fernando, Chris, Roger)
    • PCB inspection
    • Rigid-flex inspection
    • Cathode foil production
    • Foil inspection report report
    • Other
  3. Engineering (Bill, David, Lubomir)
    • Wire stringing table and movement system control
    • Tension measurements [1], [2]
    • Other
  4. Full-scale prototype (Beni, Lubomir)
  5. Other