Difference between revisions of "Minutes-1-5-2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 9: Line 9:
 
#* Cooling system
 
#* Cooling system
 
# Electronics update (Chris)
 
# Electronics update (Chris)
 +
#* Pre-amp cards
 +
#* HV cabling
 +
#* Grounding (Lubomir)
 
#* LV cabling [http://www.jlab.org/Hall-D/detector/fdc/electronics/LVscheme.pdf Vlad's scheme]
 
#* LV cabling [http://www.jlab.org/Hall-D/detector/fdc/electronics/LVscheme.pdf Vlad's scheme]
 
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Simon)  
 
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Simon)  

Revision as of 18:22, 4 January 2012

January 5, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production update
    • Second package tests (Lubomir)
  2. Engineering update (Bill)
    • Cooling system
  3. Electronics update (Chris)
    • Pre-amp cards
    • HV cabling
    • Grounding (Lubomir)
    • LV cabling Vlad's scheme
  4. TDR (Simon)
  5. Other