Difference between revisions of "Minutes-1-5-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "November 17, 2011 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_5_2012.xlsx Construction Tracking] (Dave) #* ...")
 
Line 9: Line 9:
 
#* Cooling system
 
#* Cooling system
 
# Electronics update (Chris)
 
# Electronics update (Chris)
#* [http://www.jlab.org/Hall-D/detector/fdc/electronics/LVscheme.pdf Vlad's LV cabling]
+
#* LV cabling [http://www.jlab.org/Hall-D/detector/fdc/electronics/LVscheme.pdf Vlad's scheme]
# Chamber testing at 126
+
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Simon)  
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Lubomir)  
+
 
# Other
 
# Other
  

Revision as of 18:19, 4 January 2012

November 17, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production update
    • Second package tests (Lubomir)
  2. Engineering update (Bill)
    • Cooling system
  3. Electronics update (Chris)
  4. TDR (Simon)
  5. Other