Minutes-1-3-2013
From GlueXWiki
January 3, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave),picture of the three packages
- Corrosion tests (Lubomir)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log
- Other