Difference between revisions of "Minutes-1-3-2013"
From GlueXWiki
Line 13: | Line 13: | ||
= Minutes = | = Minutes = | ||
− | Participants: Eugene, Bill, Dave, Chris, Nick | + | Participants: Eugene, Bill, Dave, Chris, Nick, and Lubomir. |
== Production == | == Production == |
Revision as of 15:19, 3 January 2013
January 3, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave),picture of the three packages
- Corrosion tests (Lubomir)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log
- Other