Minutes-1-20-2011
From GlueXWiki
January 20, 2011 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status
- ETC [After_Snapshot_CR11-006_Hall_D_ETC_14_January_11_PMK_v2.pdf schedule]
- Electronics (Fernando, Chris, Roger)
- Rigid-flex assemblies
- Foil production status
- Other
- Engineering (Bill, David, Lubomir)
- Wire stringing FDC Log Book, page 549
- Movement control
- Other
- Full-scale prototype studies
- Latest tests (Lubomir)
- Other