Difference between revisions of "Minutes-1-20-2011"

From GlueXWiki
Jump to: navigation, search
(Engineering)
 
(8 intermediate revisions by the same user not shown)
Line 15: Line 15:
 
#* Other
 
#* Other
 
# Full-scale prototype studies
 
# Full-scale prototype studies
#* Latest tests (Lubomir)
+
#* Latest tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 550] (Lubomir)
 
# Other
 
# Other
 
<!--
 
  
 
= Minutes =
 
= Minutes =
  
Participants: Bill, Fernando, Eugene, Dave, Roger, Simon, and Lubomir.
+
Participants: Dave, Chris, Simon, Beni, Fernando, Glenn, and Lubomir.
  
 
== Production ==
 
== Production ==
  
- According to Tim, Dominion Power will have the power ready by next week. There were weather related delays. Dave: the electrical wiring inside the clean room is done, but data cables remain to be installed. Dave is is also busy with paperwork related to the production: quality plan, conduct of operation, clean room procedure, etc.
+
- Dave: there was a walk trough the clean room yesterday with the vendor. The emergency exit door must be sealed better. Glass on the dark room door must be covered. The move in date is postponed to Jan 31. Dave has prepared conduct of operation documents for the clean room.
 +
 
 +
- New ETC schedule: the full package testing is postponed and squeezed. Fernando: even with the new schedule we may not have the electronics needed for the tests, so we need to have  alternative testing procedure.
  
 
== Electronics ==
 
== Electronics ==
  
- Roger: answer from Allflex regarding our foil inspection report. The packing we suggested can be done. The most difficult is to avoid the stains. They will respond to all the questions in our report later this week.
+
- Chris sent the first article signal cables back to the company to fix the cable problem.
  
- Roger expects e-mails from Fernando and Bill regarding the acceptance of the first article rigid-flex assemblies. Bill checked for matching to the cathode foil and frame, but he will check it also in the drawings. Chris will do some more measurements before the Fernando's approval. After the meeting Roger mentioned (based on Casey's information) that the contacts of the new rigid-flexes are not tinned, but they were tinned on the flexes for the full-scale prototype. We will correct this so that they are tinned in the mass production. Lubomir was concerned of the ground strip on the cathode foil touching the flex: due to the strong coupling it may attenuate the signals; this can be estimated.
+
- We discussed two issues with the rigid-flex assemblies. The thickness of the board is 18-18.5 mils, while it is specified to be 14+/-3 mils. Assuming before a thickness of 22 mils, Bill found this will cause a problem in a region where the connectors from two neighboring cathodes overlap. Bill will have the final word if this will still be a problem with 18.5 mils. The second issue is if we want to have the flex contacts tinned. It is related to the soldering procedure we want to use: conventional soldering, or using conductive tape. Fernando explained to us that the tinning can be done later during the board stuffing, although the tin layer will have different shape. This will give us time to investigate both options. Therefore, everybody agreed to approve the rigid-flex production as it is, i.e. with bare gold contacts. We discussed again the two soldering options. All they require more tests that we will do in the coming weeks.
  
- Fernando; the first article signal cables had a problem: one of the connectors had opposite polarity. He is contacting the company. Other than that the quality is very good.
+
- Fernando: thanks to Glenn the PR for the ASICs is now out and we expect all the ASICs by the end of May.
 
+
- fADC125: according to Fernando there are some modifications that have to be done for the next fADC125 version by March 2011. Gerard will be able to work on this starting February.
+
  
 
== Engineering ==
 
== Engineering ==
  
- Wire stringing: this week we started wire stringing (first time at JLab!). After some trials it works well now: we have strung ~50 sense and ~5 field wires. Results for the position measurements on few wires are shown at FDC logbook page 549. For these  measurements we used the laser sensor and the encoder. Results: the sigma of the deviation from the nominal value for the distance between the sense wires, is 6 microns (very good result!), while it is ~25 microns for the sense to filed wire distance. Full scan of the wire positions will be done after all they are installed. Bill: as mentioned before by Eugene we need to define a reference point (detectable by the laser sensor) on the frame to relate it to the wires, it can be put on the strongback. Bill is working also on the attachments for the camera and the magnet.  
+
- Working with the new stringing system is so far successful. Wires for one full chamber were strung. The wire positions were measured by Beni (page 549): the resolution is about 10-15 microns which is acceptable. The main issue is the flatness of the frame on the strongback. Right now the frame has a conical shape with the outer diameter sticking up (up to 1-2mm at some places) that makes problematic putting the wires on the pads. Bill proposed to add clamps (like a comb) between the wires too press the frame down to the strongback. These clamps may interfere with the wires during the stringing and so far the proposal is to cover the whole frame during the stringing with a flat sheet. It might be a problem to take it out since there's not enough clearance between the wires and the frame when it is at the lowest position. Another option was investigated by Casey: to tape down the wires close to the pads. He used the height gage to put the tape vertically; it moved by about 25 microns.
  
- The plan is to string all the wires, to solder them and do position and tension measurements (highest priority since we have never done this before). Then we will continue with the gluing of the PCB rings.
+
- Larry from Cross Computing was at JLab once more at the end of last week. He made few low level programs that were actually used for the position measurements. This automated procedure was checked by visually looking at the laser spot. Apart from a systematic offset (few tens of microns) different for the sense and field wires, the procedure gives consistent results.
 
+
- Larry from Cross Computing (representing Parker) was at JLab end of last week working on low level software for the stepper motor controller. We are considering making a contract (for no more than one week work) to finish the job. The software must be open so that we can modify it.
+
  
 
== Full-scale prototype tests ==
 
== Full-scale prototype tests ==
  
- Simon presented his results for the FDC resolutions with 40/60 Ar/CO2 gas mixture (page 584). Using Garfield smearing of the drift times in the MC simulations he demonstrates that the effective resolution is close the the one with Gaussian smearing with a sigma of 200 microns. Eugene had questions regarding details of the procedure and the Garfield simulations. Next step: generating smearing with Garfield with the magnetic field on.
+
- Lubomir re-visited the unsolved problem that wires are not in the middle w.r.t. top and bottom cathodes. This time the long wires were scanned along their lengths. One sees (page 550) systematically that the wires are closer to the middle at the beginning of the wire going up at the middle of the chamber by up to 1.5mm. This may indicate that the cathodes are sagging. It could be due to pressure difference, gravitation, or electrostatic forces. The last two effects normally must be small. The holes on the cathode frames must eliminate the differential pressure on the cathode, but it could be that the ground plane sags and couples to the cathodes strongly in the middle. The plan is to investigate the pressure effects by changing the gas flow. The next step would be to turn the chamber upside down, but most likely at this position the chamber will not be operational. Therefore, before doing this any other ideas of what needs to be checked, are welcome.
 +
 
 +
 
 +
 
 +
== Others ==
  
-->
+
For the next collaboration meeting (Feb 2-3) Beni and Lubomir will decide about the FDC talks in the tracking session. Simon will talk about the tracking analyses in the off-line session.

Latest revision as of 18:57, 20 January 2011

January 20, 2011 FDC meeting

Tentative Agenda

  1. Production (David)
  2. Electronics (Fernando, Chris, Roger)
    • Rigid-flex assemblies
    • Foil production status
    • Other
  3. Engineering (Bill, David, Lubomir)
  4. Full-scale prototype studies
  5. Other

Minutes

Participants: Dave, Chris, Simon, Beni, Fernando, Glenn, and Lubomir.

Production

- Dave: there was a walk trough the clean room yesterday with the vendor. The emergency exit door must be sealed better. Glass on the dark room door must be covered. The move in date is postponed to Jan 31. Dave has prepared conduct of operation documents for the clean room.

- New ETC schedule: the full package testing is postponed and squeezed. Fernando: even with the new schedule we may not have the electronics needed for the tests, so we need to have alternative testing procedure.

Electronics

- Chris sent the first article signal cables back to the company to fix the cable problem.

- We discussed two issues with the rigid-flex assemblies. The thickness of the board is 18-18.5 mils, while it is specified to be 14+/-3 mils. Assuming before a thickness of 22 mils, Bill found this will cause a problem in a region where the connectors from two neighboring cathodes overlap. Bill will have the final word if this will still be a problem with 18.5 mils. The second issue is if we want to have the flex contacts tinned. It is related to the soldering procedure we want to use: conventional soldering, or using conductive tape. Fernando explained to us that the tinning can be done later during the board stuffing, although the tin layer will have different shape. This will give us time to investigate both options. Therefore, everybody agreed to approve the rigid-flex production as it is, i.e. with bare gold contacts. We discussed again the two soldering options. All they require more tests that we will do in the coming weeks.

- Fernando: thanks to Glenn the PR for the ASICs is now out and we expect all the ASICs by the end of May.

Engineering

- Working with the new stringing system is so far successful. Wires for one full chamber were strung. The wire positions were measured by Beni (page 549): the resolution is about 10-15 microns which is acceptable. The main issue is the flatness of the frame on the strongback. Right now the frame has a conical shape with the outer diameter sticking up (up to 1-2mm at some places) that makes problematic putting the wires on the pads. Bill proposed to add clamps (like a comb) between the wires too press the frame down to the strongback. These clamps may interfere with the wires during the stringing and so far the proposal is to cover the whole frame during the stringing with a flat sheet. It might be a problem to take it out since there's not enough clearance between the wires and the frame when it is at the lowest position. Another option was investigated by Casey: to tape down the wires close to the pads. He used the height gage to put the tape vertically; it moved by about 25 microns.

- Larry from Cross Computing was at JLab once more at the end of last week. He made few low level programs that were actually used for the position measurements. This automated procedure was checked by visually looking at the laser spot. Apart from a systematic offset (few tens of microns) different for the sense and field wires, the procedure gives consistent results.

Full-scale prototype tests

- Lubomir re-visited the unsolved problem that wires are not in the middle w.r.t. top and bottom cathodes. This time the long wires were scanned along their lengths. One sees (page 550) systematically that the wires are closer to the middle at the beginning of the wire going up at the middle of the chamber by up to 1.5mm. This may indicate that the cathodes are sagging. It could be due to pressure difference, gravitation, or electrostatic forces. The last two effects normally must be small. The holes on the cathode frames must eliminate the differential pressure on the cathode, but it could be that the ground plane sags and couples to the cathodes strongly in the middle. The plan is to investigate the pressure effects by changing the gas flow. The next step would be to turn the chamber upside down, but most likely at this position the chamber will not be operational. Therefore, before doing this any other ideas of what needs to be checked, are welcome.


Others

For the next collaboration meeting (Feb 2-3) Beni and Lubomir will decide about the FDC talks in the tracking session. Simon will talk about the tracking analyses in the off-line session.