Difference between revisions of "Minutes-1-19-2012"
From GlueXWiki
(Created page with "January 19, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_19_2012.xlsx Construction Tracking] (Dave) #* ...") |
(→Agenda) |
||
Line 8: | Line 8: | ||
# Engineering update (Bill) | # Engineering update (Bill) | ||
# Electronics update (Chris) | # Electronics update (Chris) | ||
− | #* Pre-amp | + | #* Pre-amp cards: anode card gain? |
− | #* LV cabling | + | #* LV cabling |
# Testing in 126 (Beni) | # Testing in 126 (Beni) | ||
# Other | # Other |
Revision as of 19:01, 18 January 2012
January 19, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production update
- First package cabling
- Engineering update (Bill)
- Electronics update (Chris)
- Pre-amp cards: anode card gain?
- LV cabling
- Testing in 126 (Beni)
- Other