Difference between revisions of "Minutes-1-19-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "January 19, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_19_2012.xlsx Construction Tracking] (Dave) #* ...")
 
(Agenda)
Line 8: Line 8:
 
# Engineering update (Bill)   
 
# Engineering update (Bill)   
 
# Electronics update (Chris)
 
# Electronics update (Chris)
#* Pre-amp card: anode card gain?
+
#* Pre-amp cards: anode card gain?
#* LV cabling (Lubomir)
+
#* LV cabling
 
# Testing in 126 (Beni)
 
# Testing in 126 (Beni)
 
# Other
 
# Other

Revision as of 19:01, 18 January 2012

January 19, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production update
    • First package cabling
  2. Engineering update (Bill)
  3. Electronics update (Chris)
    • Pre-amp cards: anode card gain?
    • LV cabling
  4. Testing in 126 (Beni)
  5. Other