Difference between revisions of "Minutes-1-17-2013"
From GlueXWiki
Line 4: | Line 4: | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_17_2012.xlsx Construction Tracking] | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_17_2012.xlsx Construction Tracking] | ||
#* Production status (Dave) | #* Production status (Dave) | ||
− | #* Plans for spare parts [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Redundant. | + | #* Plans for spare parts [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Redundant.xls] |
# Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_FDC.xls activities] ,[http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_guide.docx guideline] (Lubomir, Bill, Dave) | # Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_FDC.xls activities] ,[http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_guide.docx guideline] (Lubomir, Bill, Dave) | ||
# Engineering (Bill) | # Engineering (Bill) |
Revision as of 19:12, 16 January 2013
January 17, 2013 FDC meeting
Agenda
- Production Construction Tracking
- Production status (Dave)
- Plans for spare parts [1]
- Basis of Estimate for the FDC activities ,guideline (Lubomir, Bill, Dave)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Fourth package tests FDC E-log Entry 101
- Other