== Engineering ==
 
== Engineering ==
  
- Dave presented his plan for
+
- Dave presented his plan for re-using AC power
  
 
- The FDC chiller has been finally shipped for repair.
 
- The FDC chiller has been finally shipped for repair.
  
 
- We discussed options for turning off the power of the FDC chiller in case the temperature of the Fluorinert is out of the limits. On the next day Dave looked into this and decided to do something he's doing for HallB: external box that is plugged between the outlet and the chiller (note: 208V three phases 30A). It has a relay inside controlled by the PLC system that is taking the temperature from the epics readings of the chiller.
 
- We discussed options for turning off the power of the FDC chiller in case the temperature of the Fluorinert is out of the limits. On the next day Dave looked into this and decided to do something he's doing for HallB: external box that is plugged between the outlet and the chiller (note: 208V three phases 30A). It has a relay inside controlled by the PLC system that is taking the temperature from the epics readings of the chiller.

Revision as of 18:01, 16 January 2015

January 15, 2015 FDC+CDC meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. FDC meeting ID: 290664653
  3. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. File:CDCUpdate15Jan2015.pdf (Mike)
  2. FDC update
  3. Electronics
  4. Engineering Chiller Interlock (Dave)
  5. Other