Minutes-1-13-2011
From GlueXWiki
January 13, 2011 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status
- Electronics (Fernando, Chris, Roger)
- PCBs
- Rigid-flex assemblies
- Foil inspection report, new packaging
- Other
- Engineering (Bill, David, Lubomir)
- Wire stringing FDC Log Book, page 549
- Movement control
- Other
- Full-scale prototype studies
- Tracking resolution FDC Log Book, page 546 (Simon)
- Other
Minutes
Participants: Bill, Fernando, Eugene, Dave, Roger, Simon, and Lubomir.
Production
- According to Tim, Dominion Power will have the power ready by next week. There were weather related delays. Dave: the electrical wiring inside the clean room is done, but data cables remain to be installed. Dave is is also busy with paperwork related to the production: quality plan, conduct of operation, clean room procedure, etc.
Electronics
- Roger: answer from Allflex regarding our inspection report. The packing we suggested can be done. The most difficult is to avoid the stains, but they are not reactive.