Difference between revisions of "Minutes-1-13-2011"

From GlueXWiki
Jump to: navigation, search
Line 18: Line 18:
 
# Other
 
# Other
  
<!--
 
  
 
= Minutes =
 
= Minutes =
  
Participants: Bill, Fernando, Mike, Dave, Mark, Chris, Roger, and Lubomir.
+
Participants: Bill, Fernando, Eugene, Dave, Roger, Simon, and Lubomir.
Mike is our new technician.  
+
  
 
== Production ==
 
== Production ==
  
- Dave: the clean room will be ready on Jan. 18, but then Jlab will do the wiring (power and internet) inside, which will bring us to the end of January. Right now Dominion Power is working on the power. In the mean time we will get a temporary staging area.  
+
- According to Tim, Dominion Power will have the power ready by next week. There were weather related delays. Dave: the electrical wiring inside the clean room is done, but data cables remain to be installed. Dave is is also busy with paperwork related to the production: quality plan, conduct of operation, clean room procedure, etc.
 
+
- ETC change request: the package full tests are scheduled to start at the beginning of 2012, but will not have enough electronics for one package until Nov. 2012. At the other hand, the installation is supposed to start  at the beginning of 2013. Lubomir will discuss this with Tim.  
+
  
 
== Electronics ==
 
== Electronics ==
  
 +
- Roger: answer from Allflex regarding our inspection report. The packing we suggested can be done. The most difficult is to avoid the stains, but they are not reactive.
 +
 +
 +
<!--
 
- Chris: almost all the PCBs were tested channel by channel and all they are holding 2500V. They were cleaned very well. Fernando: the only operation that is needed is to fill the vias that were not sealed, with humiseal or epoxy. The only concern in doing this (Bill) is the thickness of the humiseal that is need; we need to make sure it doesn't interfere with the wires during stringing.  
 
- Chris: almost all the PCBs were tested channel by channel and all they are holding 2500V. They were cleaned very well. Fernando: the only operation that is needed is to fill the vias that were not sealed, with humiseal or epoxy. The only concern in doing this (Bill) is the thickness of the humiseal that is need; we need to make sure it doesn't interfere with the wires during stringing.  
  

Revision as of 18:19, 13 January 2011

January 13, 2011 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status
  2. Electronics (Fernando, Chris, Roger)
  3. Engineering (Bill, David, Lubomir)
  4. Full-scale prototype studies
  5. Other


Minutes

Participants: Bill, Fernando, Eugene, Dave, Roger, Simon, and Lubomir.

Production

- According to Tim, Dominion Power will have the power ready by next week. There were weather related delays. Dave: the electrical wiring inside the clean room is done, but data cables remain to be installed. Dave is is also busy with paperwork related to the production: quality plan, conduct of operation, clean room procedure, etc.

Electronics

- Roger: answer from Allflex regarding our inspection report. The packing we suggested can be done. The most difficult is to avoid the stains, but they are not reactive.