Difference between revisions of "Minutes-1-13-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 6: Line 6:
 
#* Blue Crab status
 
#* Blue Crab status
 
# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)
#* PCB
+
#* PCBs
#* Rigid-flex  
+
#* Rigid-flex assemblies
 
#* Foil inspection [http://www.jlab.org/Hall-D/detector/fdc/reports/Cathode_Foil_Inspection_Report_bills.docx report]
 
#* Foil inspection [http://www.jlab.org/Hall-D/detector/fdc/reports/Cathode_Foil_Inspection_Report_bills.docx report]
 
#* Other  
 
#* Other  

Revision as of 17:11, 12 January 2011

January 13, 2011 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status
  2. Electronics (Fernando, Chris, Roger)
    • PCBs
    • Rigid-flex assemblies
    • Foil inspection report
    • Other
  3. Engineering (Bill, David, Lubomir)
    • Wire stringing
    • Movement control
    • Other
  4. Full-scale prototype studies
  5. Other