Mini FCAL Meeting Mon. Jan. 23, 2012

From GlueXWiki
Revision as of 09:14, 23 January 2012 by Davidl (Talk | contribs) (Created page with " ==Video Conferencing== * ESNet: 8542553 (EVO can be bridged upon request) ==Agenda== #Detector Status (John): #* alignment #* gain balancing #* resolution #* timing #: #DAQ St...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Video Conferencing

  • ESNet: 8542553

(EVO can be bridged upon request)

Agenda

  1. Detector Status (John):
    • alignment
    • gain balancing
    • resolution
    • timing
  2. DAQ Status (Alex):
    • pulse modes
    • scalars
    • Hall B DAQ integration
  3. Online Software (Dave)
  4. HV controls/EPICS (Hovanes)
  5. Future Plans (All):
    • Hall B energies
    • remote scintillator size change
    • remaining goals at current location
    • move to floor
    • remaining overall goals
    • BCAL test