Difference between revisions of "Microscope Prototype Beam Test"
From GlueXWiki
Senderovich (Talk | contribs) m (→Schedule) |
Senderovich (Talk | contribs) m |
||
Line 11: | Line 11: | ||
* JLab visit dates by UConn group: | * JLab visit dates by UConn group: | ||
− | ** Oct | + | ** Oct 8-15, 2010 (personnel: Richard J., Igor S.) Goals: |
*** instrumentation staging - testing of DAQ with microscope out of the Hall (on the bench) | *** instrumentation staging - testing of DAQ with microscope out of the Hall (on the bench) | ||
*** completion of site requirements for work in the Hall by all members (walk through/down times?) | *** completion of site requirements for work in the Hall by all members (walk through/down times?) |
Revision as of 03:54, 11 October 2010
The purpose of this note is to gather all the information pertinent to the beam test of the tagger microscope prototype in Hall B planned for the fall of 2010.
Contents
Introduction
- Proposal: [link TBA]
Schedule
- JLab visit dates by UConn group:
- Oct 8-15, 2010 (personnel: Richard J., Igor S.) Goals:
- instrumentation staging - testing of DAQ with microscope out of the Hall (on the bench)
- completion of site requirements for work in the Hall by all members (walk through/down times?)
- Oct 8-15, 2010 (personnel: Richard J., Igor S.) Goals:
Setup
Counter positioning
- Hall B Tagger Montecarlo
- Source [link TBA]
- Results [TBA]
- Selected position: [info TBA]
- Coordinates:
- Position instructions:
- Discriminator selection/positioning instructions:
DAQ setup
Configuration
Connection/Operation instructions
- interface?
- remote connection?