Difference between revisions of "May 6, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(4 intermediate revisions by 2 users not shown)
Line 20: Line 20:
 
#  [[GlueX-Collaboration-May-2016|Collaboration Meeting]]
 
#  [[GlueX-Collaboration-May-2016|Collaboration Meeting]]
 
# Optical box design update (MIT):
 
# Optical box design update (MIT):
#* Laser access port design (Avetik/Maria)
+
#* Laser access port design (Avetik/Maria) [https://gluexdirc.mit.edu/sites/default/files/images/light_port2.pdf  new cartoon]
#* Photon loss due to the gap for the fiber [[https://gluexdirc.mit.edu/mirror-gap|mirror gap]]
+
#* Photon loss due to the gap for the fiber [[https://gluexdirc.mit.edu/mirror-gap mirror gap]]
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2996 Bar box shipping document] (John and Matt)
+
#* [https://gluexdirc.mit.edu/mirror-reflectivity-versus-time Mirror Reflectivity ]
 +
# [https://gluexdirc.mit.edu/lookup-table-implementation Lookup Table Implementation]
 +
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2996 Bar box shipping document] (John and Matt)
 
# Support structure design update (IU)
 
# Support structure design update (IU)
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# AOB
 
# AOB

Latest revision as of 17:12, 24 February 2017

Meeting Information

GlueX PID Upgrade Meeting
Friday, May 6, 2016
11 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Optical box design update (MIT):
  4. Lookup Table Implementation
  5. Bar box shipping document (John and Matt)
  6. Support structure design update (IU)
  7. Planning for FY16
  8. AOB