Difference between revisions of "May 31, 2018 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Thursday May 31, 2018<br> 10:00 am, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room s...") |
|||
Line 19: | Line 19: | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | ||
#* Pre-brief material online by June 15 | #* Pre-brief material online by June 15 | ||
+ | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting] | ||
# Support structure update (Tim, Mark) | # Support structure update (Tim, Mark) | ||
#* Roll fixture and bar box installation | #* Roll fixture and bar box installation |
Revision as of 08:48, 31 May 2018
Meeting Information
GlueX DIRC Meeting
Thursday May 31, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Experimental Readiness Review June 25
- Pre-brief material online by June 15
- Collaboration meeting
- Support structure update (Tim, Mark)
- Roll fixture and bar box installation
- Preparations for bar box delivery
- Bar box transportation
- Optical box
- Status update (Ernie and Jason)
- Box production at Lesker (Ernie visit today)
- PMT test fixture
- Window procurement
- Dark box conceptual design
- Magnetic field discussion
- Status update (Ernie and Jason)
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill)
- AOB