Difference between revisions of "May 31, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Thursday May 31, 2018<br> 10:00 am, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room s...")
 
Line 19: Line 19:
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 
#* Pre-brief material online by June 15
 
#* Pre-brief material online by June 15
 +
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting]
 
# Support structure update (Tim, Mark)
 
# Support structure update (Tim, Mark)
 
#* Roll fixture and bar box installation
 
#* Roll fixture and bar box installation

Revision as of 08:48, 31 May 2018

Meeting Information

GlueX DIRC Meeting
Thursday May 31, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (Tim, Mark)
    • Roll fixture and bar box installation
    • Preparations for bar box delivery
  3. Bar box transportation
  4. Optical box
    • Status update (Ernie and Jason)
      • Box production at Lesker (Ernie visit today)
      • PMT test fixture
      • Window procurement
      • Dark box conceptual design
      • Magnetic field discussion
  5. Simulation studies (Maria and Roman)
  6. MAPMT testing (Bill)
  7. AOB