May 2008 Subsystem Review

From GlueXWiki
Revision as of 10:17, 5 March 2008 by Wolin (Talk | contribs)

Jump to: navigation, search

Introduction

The May 2008 Hall D Subsystem Review will cover all aspects of Hall D that have not been reviewed previously under the auspices of the 12 GeV project office. This includes electronics, trigger, DAQ, event and hardware monitoring, experiment and hardware controls, and detector integration assembly, and maintainability.


Charge for the Review Committee

No charge for the committee has been established yet (Mar 2008). A potential charge, based on charges from previous reviews, might be:


The scope of this review includes all aspects of the following Hall D systems and efforts: electronics, trigger, DAQ, event and hardware monitoring, experiment and detector controls, and detector integration, construction, and maintenance. Performance requirements, development and construction schedules, costs, and ES&H issues may be reviewed for all systems, as well as any other considerations that may influence the construction and operation of the Hall D detector.

In addition, for electronics systems the scope may include functional design, technology choice, fabrication considerations, testing and quality control, maintainability, and long-term viability. For computing systems the scope may include computing architecture, network design, data flow issues, protocol choices, and network and computing hardware choices. For software the scope may include functional design, complexity, coding and language concerns, testing and quality control, commissioning, operational concerns, and long-term maintainability. For hardware the scope may include design philosophy, material selection, fabrication choices, levels of redundancy, commissioning procedures, costs for materials and labor, quality control, and operational reliability and longevity.

You are asked to address the following questions:

1. Are the technical performance requirements adequate, appropriate, and complete for each system?

2. Do the current designs and plans appear likely to achieve the performance specifications with a low risk of cost increases, schedule delays, and performance problems? Are there opportunities for improvements in cost or performance that the design teams should consider?

3. Are the R&D efforts appropriate, complete, and likely to reduce risks?

4. Have ES&H considerations been adequately incorporated into the designs and plans?


Preparation

Below I list topics the review committee might focus on. Clearly the committee cannot investigate all of these in depth, but we can expect they will want an overview of all of them, and may probe a few in depth.


Electronics

  • preamps
  • discriminators
  • F1TDC
  • FADC250
  • FADC125
  • SSP
  • GTP
  • TI
  • TS
  • timing distribution system
  • trigger distribution system
  • cable choices
  • HV systems
  • LV systems
  • C-W and other bases
  • SiPM's and other PMT's
  • crate choices (VXS, ATCA)
  • etc.


Trigger

  • algorithm
  • rates
  • backgrounds


DAQ

  • event size
  • data rate
  • computer hardware choices
  • network hardware choices and configuration


Event and Hardware Monitoring


Experiment and Detector Controls


Detector Integration


Detector Construction


Detector Maintenance


Pre-brief Materials

Presenations