Difference between revisions of "May 17, 2023, FCAL Insert Installation Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Minutes)
Line 22: Line 22:
  
 
== Minutes ==
 
== Minutes ==
* Reviewed minutes from previous meeting
 
** Malte - shift plan not needed as folks wishing to help can come and inspect almost anytime as there are modules on the table
 
** Using 50 um alum mylar tape is fine. Should use narrower tape for cuts at strap - need to measure thickness to verify
 
** Unstacking about 60% complete, only 4 shims thus far as expected at center SS tube
 
** Malte will separate modules (36) for stack test - Scot to get Radcon to release - tech crew will set up and test fixture
 
** Sasha stated that Hakov will come in June to help with stacking
 
** LMS -
 
*** Sasha received some fiber
 
*** There is about 12" x 12" x 12" available under FCAL frame at center to accommodate sphere
 
*** fibers need 2 cm bend radius
 
*** Sasha/Arshak will supply sketch to see if it will fit at center - otherwise it mus be moved off center
 
* Malte showed the brown modules near center rows - about 1/3 to 1/2 of the module length is affected (2-3 layers around center)
 
* Malte and Mark are performing refurb on some modules
 
* Tech crew doing most of the unstacking and inspection this week
 
* Others may get involved with inspection
 
*after meeting we discussed cable labeler and Eugene approved the purchase ($3.5K)
 

Revision as of 16:51, 16 May 2023

Meeting Time and Place =

Wednesday May 17, 2023 9am At Jefferson Lab, Hall D Counting House and on Zoom https://jlab-org.zoomgov.com/j/1619449114?pwd=UFlVQ1dWTGZ0ZkVYSEx5QzE4YUI3dz09&from=addon meeting ID: 161 944 9114 Passcode: 562689

Agenda

Minutes