Line 10: | Line 10: | ||
** Tim -- CPP Design, procurements and Analysis, | ** Tim -- CPP Design, procurements and Analysis, | ||
** Mark -- Return planning [[Media:Beam Resumption plan_tw.docx]], Log entries, Daily Virtual walktrough, training | ** Mark -- Return planning [[Media:Beam Resumption plan_tw.docx]], Log entries, Daily Virtual walktrough, training | ||
− | ** Scot -- SAD schedule, training | + | ** Scot -- Resumption Schedule, SAD schedule, training |
− | ** Josh -- | + | ** Josh -- Review Resumption Documentation training tagger window replacement |
** Stephanie -- CPP Redesign for alignment, CAD | ** Stephanie -- CPP Redesign for alignment, CAD | ||
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps | ** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps |
Revision as of 06:51, 13 May 2020
Meeting Time and Place
Wednesday May 13, 2020 at 9am Bluejeans https://bluejeans.com/835373169
Agenda
- Covid-19 https://www.governor.virginia.gov/media/governorvirginiagov/governor-of-virginia/images/press-photos/Phase-One-Slide-Social.jpg
- Jlab Update - Media:Physics_mtg_12May.png
- On Call Activity -- Solenoid VCL alarms - Cryo had to flush a heat exchanger for one of the compressors
- Updates
- Tim -- CPP Design, procurements and Analysis,
- Mark -- Return planning Media:Beam Resumption plan_tw.docx, Log entries, Daily Virtual walktrough, training
- Scot -- Resumption Schedule, SAD schedule, training
- Josh -- Review Resumption Documentation training tagger window replacement
- Stephanie -- CPP Redesign for alignment, CAD
- Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
- Bobby -- DIRC Dark Box and Mirror Box Install CAD, 3D printing, P&ID
- Chris -- Welding, Training
- Nick -- power supply temp/Flow readings
- Help desk still live -- 269-7155
- Service now for issues - https://jlab.servicenowservices.com/nav_to.do?uri=%2Fhome.do%3F
- Daily work
- Send a daily check in email response to the group
- Complete any training that is due within the next 4 months
- Do any online training that may be available
- Update documentation you are responsible for and are able to do from home
- Familiarize with Bluejeans and attend meetings as required
- Check Web EDM (CSS) screens periodically (daily)
- Check HDLOG daily and respond as needed.
- All must be available during working hours
- If you are going out of town, notify supervisor and charge vacation
- If you are sick, charge sick time
- Charge HDOPS for the actual time spent on above activities
- Charge Public Health Emergency for the remainder of hours up to 8 per day and 40 per week max.
- Fill out timesheets daily
- Anything else?