Difference between revisions of "May 06, 2009 CDC/ Meeting"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 15: Line 15:
 
== Agenda ==
 
== Agenda ==
  
1. Assembly procedure
+
Assembly procedure
2. Leak test on assembly
+
Leak test on assembly
3. Gas flow into chamber ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1243 Gas Flow in the CDC])
+
Gas flow into chamber ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1243 Gas Flow in the CDC])
4. Lumina Straws/ Kapton vs Mylar
+
Lumina Straws/ Kapton vs Mylar
5. AOT
+
AOT

Revision as of 09:31, 6 May 2009

Meeting Time and Place

Wednesday May 6 2009 at 1:00pm At Jefferson Lab, the meeting will be held in room ARC 428

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")

Agenda

  1. Assembly procedure
  2. Leak test on assembly
  3. Gas flow into chamber (Gas Flow in the CDC)
  4. Lumina Straws/ Kapton vs Mylar
  5. AOT