May 03, 2023, FCAL Insert Installation Meeting

From GlueXWiki
Revision as of 13:39, 2 May 2023 by Whitey (Talk | contribs) (Created page with "== Meeting Time and Place == Wednesday May 03, 2023 9am At Jefferson Lab, Hall D Counting House and on Zoom https://jlab-org.zoomgov.com/j/1619449114?pwd=UFlVQ1dWTGZ0ZkVYSEx5...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place

Wednesday May 03, 2023 9am At Jefferson Lab, Hall D Counting House and on Zoom https://jlab-org.zoomgov.com/j/1619449114?pwd=UFlVQ1dWTGZ0ZkVYSEx5QzE4YUI3dz09&from=addon meeting ID: 161 944 9114 Passcode: 562689

Agenda

Minutes

  • We went over minutes and action items from the previous meeting
  • Malte requested a log entry to be made everyday to keep track of how many modules were removed.
  • Malte to come up with a multi shift plan for unstacking and inspecting
  • There has been some difficulty un-torquing the bolts on the side pressure bars. Keith will break the torque on all the upper bars using the proper tools.
  • Sasha wishes to set up a stacking test