Difference between revisions of "May 03, 2023, FCAL Insert Installation Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Agenda)
Line 10: Line 10:
 
* Minutes from last meeting  https://halldweb.jlab.org/wiki/index.php/March_26,_2023,_FCAL_Insert_Installation_Meeting
 
* Minutes from last meeting  https://halldweb.jlab.org/wiki/index.php/March_26,_2023,_FCAL_Insert_Installation_Meeting
 
* Status of dis-assembly
 
* Status of dis-assembly
** Updated Work plan for module removal
+
** Updated Work plan for module removal - Malte
 
* Crystal/glass boundary
 
* Crystal/glass boundary
 
** [[Media:Thermacool.pdf]]
 
** [[Media:Thermacool.pdf]]
 
** Samples in hand (.062" and .035", no glue)
 
** Samples in hand (.062" and .035", no glue)
 
* Discuss glass and crystal module install, shimming etc... [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation] - Sasha/Malte etc...
 
* Discuss glass and crystal module install, shimming etc... [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation] - Sasha/Malte etc...
* Cable update
 
 
*LMS decision?
 
*LMS decision?
  

Revision as of 13:51, 2 May 2023

Meeting Time and Place

Wednesday May 03, 2023 9am At Jefferson Lab, Hall D Counting House and on Zoom https://jlab-org.zoomgov.com/j/1619449114?pwd=UFlVQ1dWTGZ0ZkVYSEx5QzE4YUI3dz09&from=addon meeting ID: 161 944 9114 Passcode: 562689

Agenda

Minutes

  • We went over minutes and action items from the previous meeting
  • Malte requested a log entry to be made everyday to keep track of how many modules were removed.
  • Malte to come up with a multi shift plan for unstacking and inspecting
  • There has been some difficulty un-torquing the bolts on the side pressure bars. Keith will break the torque on all the upper bars using the proper tools.
  • Sasha wishes to set up a stacking test
    • Use lower step assy in ESB
    • Need to wait until modules are half un-stacked for Malte to determine which modules to use
    • No modules to leave the Hall without Malte (and Radcon approval).
    • G10 Sideplates are being reworked for design change on side pusher and for additional set screw locations
    • Stack 3 rows with crystals in the middle to test system
  • Stephanie to let Sasha know the length of LMS fibers based on his current plan
  • Arshak would like a 15 ft table in ESB for polishing and cutting LMS fibers - Scot will come up with something
  • Sasha would like 2 tables in EEL 108 cleanroom for student work with crystals
  • Crystal testing will be done in EEL 108 and 126