Difference between revisions of "March 25, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 19: Line 19:
 
# Announcements
 
# Announcements
 
# Optical box design update (MIT)
 
# Optical box design update (MIT)
#* Mirror reflectivity measurements (John)
+
#* [https://halldweb1.jlab.org/wiki/index.php/File:MirrorReflectivity032516.pdf Mirror reflectivity measurements] (John)
 
#* [https://gluexdirc.mit.edu/2-fibersbox-sigma-10-inclination-5 Calibration light source configuration] (Maria/Avetik)
 
#* [https://gluexdirc.mit.edu/2-fibersbox-sigma-10-inclination-5 Calibration light source configuration] (Maria/Avetik)
 
#* [https://gluexdirc.mit.edu/materials-optical-properties MAPMT coupling material properties] (Maria)
 
#* [https://gluexdirc.mit.edu/materials-optical-properties MAPMT coupling material properties] (Maria)

Latest revision as of 20:28, 24 March 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, March 25, 2016
11 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box design update (MIT)
  3. Bar box shipping (John and Matt)
  4. Support structure design update (IU)
    • Dedicated meeting with Tim this afternoon at 1:30
  5. Planning for FY16
  6. AOB