Difference between revisions of "March 19, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday March 19, 2019<br> 1:00 pm, EDT<br> JLab F326 <br> == Connection Using Bluejeans == # To join via Polycom room syste...")
 
(Agenda)
Line 28: Line 28:
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Adding # photons to LUT likelihood - N pho raw (Maria)
 
#* Adding # photons to LUT likelihood - N pho raw (Maria)
#* FastDIRC geometry implementation and alignment work (Cris/Yunjie)
+
#* FastDIRC geometry implementation and alignment work (Cris/[https://halldweb.jlab.org/wiki/images/8/88/FastDIRC_integration_031919.pdf Yunjie])
 
#* Requests for simulations: what samples, how much statistics, etc.?
 
#* Requests for simulations: what samples, how much statistics, etc.?
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# AOB
 
# AOB

Revision as of 11:54, 19 March 2019

Meeting Information

GlueX DIRC Meeting
Tuesday March 19, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Summer installation planning:
    • Window for upper box being polished and frame at shop (Ernie)
    • Plans for tests with LED fibers and canullas (Bill/Fernando)
    • Plans for making bar boxes light tight (All)
  3. Spring 2019 DIRC Commissioning (All)
    • REST file processing (ver08) just completed: /cache/halld/detectors/DIRC/RunPeriod-2019-01/dirc_monitoring/ver08/REST/
    • LED data analysis and comparison to laser test stand data (Bill/Andrew)
  4. Software/simulations
    • Implementation of realistic efficiency/time resolution in MC (Justin)
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • Adding # photons to LUT likelihood - N pho raw (Maria)
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
    • Requests for simulations: what samples, how much statistics, etc.?
  5. Software overview and tasks (All)
  6. AOB