Difference between revisions of "March 12, 2023, FCAL Insert Installation Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 16: Line 16:
 
** Subtract 16.13mm from bottom
 
** Subtract 16.13mm from bottom
 
* Cable update [[Media:FCAL2_lv,board.pdf]]
 
* Cable update [[Media:FCAL2_lv,board.pdf]]
 +
 +
== Minutes ==
 +
* Went over the minutes from the last meeting
 +
* Significant discussion on shims -
 +
** Malte has a large number of SS straps from the original modules and will serve as the shims to make up for the difference in module orientation of the lead glass blocks
 +
** Matt Shepherd brought addition SS strap and shim material
 +
** The original stack up used shims at each step so we should have plenty to reuse if needed
 +
** Discussed shimming the glass/crystal interface to get good and straight, maybe a sheet all around to give a flat surface for the crystals? Also a conductive rubber pad?
 +
*** Sasha said the one on the ComCal is coming apart so we would have to find something more robust.

Revision as of 16:55, 12 April 2023

Meeting Time and Place

Wednesday March 12, 2023 9am At Jefferson Lab, Hall D Counting House and on Zoom

Agenda

Minutes

  • Went over the minutes from the last meeting
  • Significant discussion on shims -
    • Malte has a large number of SS straps from the original modules and will serve as the shims to make up for the difference in module orientation of the lead glass blocks
    • Matt Shepherd brought addition SS strap and shim material
    • The original stack up used shims at each step so we should have plenty to reuse if needed
    • Discussed shimming the glass/crystal interface to get good and straight, maybe a sheet all around to give a flat surface for the crystals? Also a conductive rubber pad?
      • Sasha said the one on the ComCal is coming apart so we would have to find something more robust.