Difference between revisions of "March 1, 2017, Production & Analysis Working Group"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Upcoming Schedule)
Line 46: Line 46:
 
# FCAL Hit Efficiencies
 
# FCAL Hit Efficiencies
  
= Upcoming Schedule =
+
= Upcoming Study Schedule =
 
* Updates on experiment, simulation, and the comparison between the two.   
 
* Updates on experiment, simulation, and the comparison between the two.   
 
* Summary/overviews only. Detailed discussions should be held in the appropriate working groups.  
 
* Summary/overviews only. Detailed discussions should be held in the appropriate working groups.  

Revision as of 10:52, 20 February 2017

Meeting Time and Place

The meeting will be on Wednesday March 1, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326-327.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
  3. To join via phone, use one of the following numbers and the Conference ID: 115815824.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Reconstruction & Analysis Studies Status

Agenda

  1. Announcements
  2. Data Production
  3. Analysis Focus
  4. This Week's Studies
  5. Upcoming Study Schedule
  6. AOB

This Week's Topics

  • Talks: Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • Talks should be limited to 10 + 5 minutes.

Data Production

  1. Monitoring Update --- Thomas Britton
  2. Calibration Update --- Sean Dobbs
  3. Processing Update --- Alex Austregesilo

Analysis Focus: Total Cross Sections

  1. J/Ψ --- Lubomir
  2. η, ρ, ω, φ --- Simon

Studies: Hit Efficiencies

Updates on experiment, simulation, and the comparison between the two.

  1. CDC Hit Efficiencies
  2. FDC Hit Efficiencies
  3. BCAL Hit Efficiencies
  4. FCAL Hit Efficiencies

Upcoming Study Schedule

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All talks should be limited to 10 + 5 minutes.
  • Next Week: Beamline & Triggering
    • Flux
    • Beam energy
    • Polarization (TPOL & lineshape)
    • Trigger emulation
    • Triggering efficiency
  • Week after next: Alignment & Track/Shower Efficiencies
    • Drift chamber alignment
    • Tracking Efficiencies
    • BCAL Shower Efficiencies
    • FCAL Shower Efficiencies
  • The following week: Other (Any of below if update ready)
    • Efficiencies: TOF, SC
    • Means & Resolutions (time, energy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
    • Uncertainties: PID (BCAL, FCAL, TOF), Kinfit (BCAL, FCAL, tracking)
    • Channel/Analysis Studies: Branching ratios, cross sections, SDMEs, beam asymmetries
    • Other reconstruction/analysis issues