Difference between revisions of "Mar 29, 2011 Calorimetry"
From GlueXWiki
(→Minutes) |
(→Minutes) |
||
Line 47: | Line 47: | ||
##* Company that built the 500 is increasing rates for the next 2500. IU is investigating options for bidding the large order, including possibly changing vendors. | ##* Company that built the 500 is increasing rates for the next 2500. IU is investigating options for bidding the large order, including possibly changing vendors. | ||
##* Discussions are ongoing related to CAN interface to slow control system | ##* Discussions are ongoing related to CAN interface to slow control system | ||
− | ## Drawings for Fcal structure (Tim) | + | ## Drawings for Fcal structure (Tim) [http://www.jlab.org/~whitey/FCAL Sketches for comments on FCAL structure] |
# BCAL | # BCAL | ||
## Construction Status: builds, fibre QA | ## Construction Status: builds, fibre QA | ||
## First article testing (Yi) | ## First article testing (Yi) | ||
# [http://www.jlab.org/~semenov/meeting110329.pdf Simulations] | # [http://www.jlab.org/~semenov/meeting110329.pdf Simulations] |
Revision as of 13:17, 29 March 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: check cross talk of calibration inputs across modules.
- Simulation
- Need to study the reconstruction efficiency.
-
Andrei will send David instructions for using summing and configuration files.
Tentative Agenda
- Announcements
- Starting this week, we will move the Bcal Readout meeting and Cal Working Group meetings to TUESDAY 11:00
- Review of Action Items
- Calibration
- FCAL
- Construction Status: mechanical, bases
- Drawings for Fcal structure (Tim)
- BCAL
- Construction Status: builds, fibre QA
- First article testing (Yi)
- Simulations
Minutes
Attending: Beni, Elton, John, Eugene, Tim, Lubomir, Yi (JLab); Will, Serguei (USM); Matt (IU); Zisis, Andrei (UofR).
- Announcements
- Starting this week, we will move the Bcal Readout meeting and Cal Working Group meetings to TUESDAY 11:00
- Review of Action Items
- Calibration
- FCAL
- Construction Status: mechanical, bases
- John and Steve have completed wrapping blocks. Shipment expected about April 18.
- Bases Status; Only 5 non-operational out of 500. 2 have a low clock speed creating difficulties communicating with CAN bus.
- 400 bases connected to CAN bus and operating smoothly
- Investigating what is poor assembly in preparation for order of 2500 remaining bases
- Company that built the 500 is increasing rates for the next 2500. IU is investigating options for bidding the large order, including possibly changing vendors.
- Discussions are ongoing related to CAN interface to slow control system
- Drawings for Fcal structure (Tim) Sketches for comments on FCAL structure
- Construction Status: mechanical, bases
- BCAL
- Construction Status: builds, fibre QA
- First article testing (Yi)
- Simulations