Difference between revisions of "Mar 25, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 22: Line 22:
 
# Review of Action Items
 
# Review of Action Items
 
# Update - USM  
 
# Update - USM  
# Simulation runs  
+
# Simulation runs
 +
#* 7.93-mm top Al plate (with correspondent glue pockets) is added into FLUKA geometry
 +
#* Magnetic Field Map ANSYS 20081209-1_1500.dat; linear interpolation between the grid points
 +
#* Double-exponent formula for light attenuation; about 20-25% effect for close-to-readout-end hits
 +
#* Ready to start the simulation as soon as the Momentum-Angle table will be specified
 
# Geometry
 
# Geometry
 
# SiPM -  Radiation Hardness Test  (Yi)
 
# SiPM -  Radiation Hardness Test  (Yi)

Revision as of 20:25, 24 March 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Input/Decisions needed to finalize Bcal readout requirements (See also GlueX-doc-1373).
    • Define set of simulations run needed to determine dynamic range of SiPMs
  2. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. Simulation runs
    • 7.93-mm top Al plate (with correspondent glue pockets) is added into FLUKA geometry
    • Magnetic Field Map ANSYS 20081209-1_1500.dat; linear interpolation between the grid points
    • Double-exponent formula for light attenuation; about 20-25% effect for close-to-readout-end hits
    • Ready to start the simulation as soon as the Momentum-Angle table will be specified
  5. Geometry
  6. SiPM - Radiation Hardness Test (Yi)
  7. SiPM - Testing
  8. SiPM - production testing
    • Schedules
  9. Light guides

Minutes

Attending: