Difference between revisions of "Mar 25, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting)
(Tentative Agenda)
Line 23: Line 23:
 
# Update - USM  
 
# Update - USM  
 
# Simulation runs  
 
# Simulation runs  
# [http://www.jlab.org/~huttonc/BCAL%20readout%203_11_10.pptx | Geometry]
+
# Geometry
# SiPM - [[SiPM Radiation Hardness Test]] (Yi)
+
# SiPM - Radiation Hardness Test  (Yi)
# SiPM - Testing (Fernando)
+
# SiPM - Testing  
#* Planning
+
#* Test station development with measurement parameters
+
#* Review & acceptance of test station
+
#* Preliminary verification tests & analysis of test station
+
#* Fabrication of two additional test stations for UR and JLab
+
#* Responsibilties
+
 
# SiPM - production testing
 
# SiPM - production testing
 
#* Schedules
 
#* Schedules

Revision as of 18:52, 11 March 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Input/Decisions needed to finalize Bcal readout requirements (See also GlueX-doc-1373).
    • Define set of simulations run needed to determine dynamic range of SiPMs
  2. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. Simulation runs
  5. Geometry
  6. SiPM - Radiation Hardness Test (Yi)
  7. SiPM - Testing
  8. SiPM - production testing
    • Schedules
  9. Light guides

Minutes

Attending: