(Items for followup from previous meeting)
Line 11: Line 11:
 
=Items for followup from previous meeting=
 
=Items for followup from previous meeting=
  
# <strike> Check with Hall B regarding U. of Washington neutron detectors (Elton). </strike> Neutron detectors were returned to UofW.
 
 
# Input/Decisions needed to finalize Bcal readout requirements (See also GlueX-doc-1373).
 
# Input/Decisions needed to finalize Bcal readout requirements (See also GlueX-doc-1373).
#* Specify the normalization and dynamic range for the number of photons/GeV in showers (Andrei to summarize MC results)
+
#* Define set of simulations run needed to determine dynamic range of SiPMs
#** charged particles should also be included into the evaluation
+
#* <strike> Decide on specific grouping for SiPM sums </strike> Will do this on output of generated showers
+
#* <strike> Possibility of using air gap for SiPM coupling to light guide (Elton to write up results) </strike>
+
#* <strike> Finalize shapes of "Winston guides" </strike>  Basic information in GlueX-doc-1432.
+
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 18:32, 11 March 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Input/Decisions needed to finalize Bcal readout requirements (See also GlueX-doc-1373).
    • Define set of simulations run needed to determine dynamic range of SiPMs

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. Simulation runs
  5. | Geometry
  6. SiPM - SiPM Radiation Hardness Test (Yi)
  7. SiPM - Testing (Fernando)
    • Planning
    • Test station development with measurement parameters
    • Review & acceptance of test station
    • Preliminary verification tests & analysis of test station
    • Fabrication of two additional test stations for UR and JLab
    • Responsibilties
  8. SiPM - production testing
    • Schedules
  9. Light guides

Minutes

Attending: