Difference between revisions of "Mar 17, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 28: Line 28:
 
# Action Items
 
# Action Items
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
 +
#* Updated evms table
 
# [[Test Setup for SiPMs | First article testing]] (Carl and Yi)
 
# [[Test Setup for SiPMs | First article testing]] (Carl and Yi)
 
#* [http://www.jlab.org/~yqiang/halld/SiPM/first_article/Update_20110317.pptx Update_20110317]
 
#* [http://www.jlab.org/~yqiang/halld/SiPM/first_article/Update_20110317.pptx Update_20110317]
 +
#* 27 units out of 80 have been tested.
 +
#* Uniformity is very good. Dark rate is about 1 MHz/tile. A single tile has a high dark rate of 1MHz.
 +
#* Need to prepare measurements in a magnetic field. Will coordinate with Tom Carstens for testing with coil 3 in test lab.
 +
#* Carl mentioned that he thought the pins of the LED might be magnetic. This should be checked
 
# Mechanical cooling (Jim)
 
# Mechanical cooling (Jim)
 
#* Review status of drawings for prototype (Chuck)
 
#* Review status of drawings for prototype (Chuck)
 +
#* All but two drawings are signed, the remaining two should be completed tomorrow. Prototype will go out for construction early next week.
 
# Temperature compensation (Jack)
 
# Temperature compensation (Jack)
 +
#* Jack is setting up a dark box for testing his prototype.
 
# Preamp-summing (Fernando)
 
# Preamp-summing (Fernando)
 +
#* Layout for a single sum section was completed. After duplicating for the rest of the board, the step file will be passed on to Jim to incorporate into the mechanical  model.
 
# Discussion
 
# Discussion

Revision as of 17:31, 17 March 2011

References

Action Items from previous meetings

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. First article testing (Carl and Yi)
  5. Mechanical cooling (Jim)
    • Review status of drawings for prototype (Chuck)
  6. Temperature compensation (Jack)
  7. Preamp-summing (Fernando)
  8. Discussion

Minutes

Attending: Jim, Jack, Elton, Eugene, Carl, Yi, Fernando

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
    • Updated evms table
  4. First article testing (Carl and Yi)
    • Update_20110317
    • 27 units out of 80 have been tested.
    • Uniformity is very good. Dark rate is about 1 MHz/tile. A single tile has a high dark rate of 1MHz.
    • Need to prepare measurements in a magnetic field. Will coordinate with Tom Carstens for testing with coil 3 in test lab.
    • Carl mentioned that he thought the pins of the LED might be magnetic. This should be checked
  5. Mechanical cooling (Jim)
    • Review status of drawings for prototype (Chuck)
    • All but two drawings are signed, the remaining two should be completed tomorrow. Prototype will go out for construction early next week.
  6. Temperature compensation (Jack)
    • Jack is setting up a dark box for testing his prototype.
  7. Preamp-summing (Fernando)
    • Layout for a single sum section was completed. After duplicating for the rest of the board, the step file will be passed on to Jim to incorporate into the mechanical model.
  8. Discussion