Difference between revisions of "Mar 17, 2011 SiPM Electrical and Cooling"
From GlueXWiki
m (→Tentative Agenda) |
|||
Line 23: | Line 23: | ||
== Minutes == | == Minutes == | ||
+ | ''Attending: Jim, Jack, Elton, Eugene, Carl, Yi, Fernando | ||
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # [[Test Setup for SiPMs | First article testing]] (Carl and Yi) | ||
+ | #* [http://www.jlab.org/~yqiang/halld/SiPM/first_article/Update_20110317.pptx Update_20110317] | ||
+ | # Mechanical cooling (Jim) | ||
+ | #* Review status of drawings for prototype (Chuck) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Preamp-summing (Fernando) | ||
+ | # Discussion |
Revision as of 17:23, 17 March 2011
References
- Files for discussion
- Hall D BCAL Readout Mechanical Concept (Jim Fochtman)
- Dynamic Range (See section 6 under simulations)
Action Items from previous meetings
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- First article testing (Carl and Yi)
- Mechanical cooling (Jim)
- Review status of drawings for prototype (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Discussion
Minutes
Attending: Jim, Jack, Elton, Eugene, Carl, Yi, Fernando
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- First article testing (Carl and Yi)
- Mechanical cooling (Jim)
- Review status of drawings for prototype (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Discussion