Line 23: | Line 23: | ||
# Review of Action Items | # Review of Action Items | ||
# Calibration | # Calibration | ||
+ | ## Concept for Fcal settled | ||
+ | ## Discussions on Bcal option underway | ||
+ | ##* Will present concept to this group at next meeting (Mar 29) | ||
+ | ##* Modifications include daisy-chaining LED boards together | ||
+ | ##* Use CAN bus to communicate with control boards | ||
+ | ##* Consideration for optimum placement of LED boards on detector, including possibly attaching 2 fibers to each LED | ||
+ | ##* UofR will come up with some sketches that can be passed on to our designers to verify geometry | ||
# FCAL | # FCAL | ||
## Construction Status: mechanical, bases | ## Construction Status: mechanical, bases |
Revision as of 13:06, 17 March 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: check cross talk of calibration inputs across modules.
- Fcal construction
-
JLab to provide shipping guidelines to Matt
-
Tentative Agenda
- Announcements
- Starting next week, we will move the Bcal Readout meeting and Cal Working Group meetings to TUESDAY 11:00
- Review of Action Items
- Calibration
- Concept for Fcal settled
- Discussions on Bcal option underway
- Will present concept to this group at next meeting (Mar 29)
- Modifications include daisy-chaining LED boards together
- Use CAN bus to communicate with control boards
- Consideration for optimum placement of LED boards on detector, including possibly attaching 2 fibers to each LED
- UofR will come up with some sketches that can be passed on to our designers to verify geometry
- FCAL
- Construction Status: mechanical, bases
- Drawings for Fcal structure (Tim) Sketches for comments on FCAL structure
- BCAL
- Construction Status: builds, fibre QA
- First article testing (Yi) Result Page
- Simulations
- Readout segmentation (Andrei)
Minutes
Attending: