Difference between revisions of "Mar 17, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Items for followup from previous meeting(s))
Line 13: Line 13:
 
=Items for followup from previous meeting(s)=
 
=Items for followup from previous meeting(s)=
 
# Monitoring
 
# Monitoring
#* Zisis will gather Andrei's tests and overall ideas for BCAL monitoring system.
 
 
#* Fcal: check cross talk of calibration inputs across modules.  
 
#* Fcal: check cross talk of calibration inputs across modules.  
#* Develop drawings of Fcal with the plexiglass sheet as a reference to develop further details.
 
 
# Fcal construction
 
# Fcal construction
#* Mechanical: Tim has promised review of support structure.
 
 
#* JLab to provide shipping guidelines to Matt
 
#* JLab to provide shipping guidelines to Matt
  

Revision as of 14:58, 3 March 2011

Teleconference Time: 10:30 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Fcal: check cross talk of calibration inputs across modules.
  2. Fcal construction
    • JLab to provide shipping guidelines to Matt

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. BCAL
    1. Construction Status: builds, fibre QA
  5. Simulations
    1. Readout segmentation (Andrei)
  6. FCAL
    1. Construction Status: mechanical, bases IU FCAL struct dwgs
    2. Drawings for Fcal structure (Tim)Sketches for comments on FCAL structure

Minutes

Attending: