Difference between revisions of "Mar 12, 2013 Calorimetry"
From GlueXWiki
Line 18: | Line 18: | ||
# Monitoring | # Monitoring | ||
− | #* Determine range of signals needed for Fcal monitoring (Matt) | + | #* <strike> Determine range of signals needed for Fcal monitoring (Matt) </strike> |
# SiPM | # SiPM | ||
#* After summary of SiPM parameters, provide data to Hamamatsu for comments (USM) | #* After summary of SiPM parameters, provide data to Hamamatsu for comments (USM) | ||
# Simulation | # Simulation | ||
− | #* Send parameters from detailed simulation to David to incorporate into the GlueX GEANT3 MC (Andrei) | + | #* <strike> Send parameters from detailed simulation to David to incorporate into the GlueX GEANT3 MC (Andrei) </strike> |
= Tentative Agenda = | = Tentative Agenda = | ||
Line 46: | Line 46: | ||
''Attendees: | ''Attendees: | ||
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Monitoring | ||
+ | #* [https://mailman.jlab.org/pipermail/halld-cal/2013-February/000718.html e-mail] regarding decision on Fcal monitoring LEDs | ||
+ | #* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2182 GlueX-doc-2182] [[Media:20130312_fcal_calib.pdf|FCAL calibration measurements with different colour LED's]] | ||
+ | # FCAL | ||
+ | #* Discussion of FCAL Beam Test NIM article (Kei) | ||
+ | # BCAL | ||
+ | #* [[Media:Cage1.JPG]] Left side view of Cage | ||
+ | #* [[Media:Cage2.JPG]] Front view of Cage | ||
+ | #* [[Media:Cage3.JPG]] Right side of Cage# USM | ||
+ | #* USM [[FILE:Report20130312.pdf]] MPPC Report (Orlando) | ||
+ | # Simulations | ||
+ | # TDR update | ||
+ | # Calibration of Calorimeters | ||
+ | # Any other business |
Revision as of 17:38, 12 March 2013
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
-
Determine range of signals needed for Fcal monitoring (Matt)
-
- SiPM
- After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
- Simulation
-
Send parameters from detailed simulation to David to incorporate into the GlueX GEANT3 MC (Andrei)
-
Tentative Agenda
- Announcements
- Action Items
- Monitoring
- e-mail regarding decision on Fcal monitoring LEDs
- GlueX-doc-2182 FCAL calibration measurements with different colour LED's
- FCAL
- Discussion of FCAL Beam Test NIM article (Kei)
- BCAL
- Media:Cage1.JPG Left side view of Cage
- Media:Cage2.JPG Front view of Cage
- Media:Cage3.JPG Right side of Cage# USM
- USM File:Report20130312.pdf MPPC Report (Orlando)
- Simulations
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees:
- Announcements
- Action Items
- Monitoring
- e-mail regarding decision on Fcal monitoring LEDs
- GlueX-doc-2182 FCAL calibration measurements with different colour LED's
- FCAL
- Discussion of FCAL Beam Test NIM article (Kei)
- BCAL
- Media:Cage1.JPG Left side view of Cage
- Media:Cage2.JPG Front view of Cage
- Media:Cage3.JPG Right side of Cage# USM
- USM File:Report20130312.pdf MPPC Report (Orlando)
- Simulations
- TDR update
- Calibration of Calorimeters
- Any other business