Difference between revisions of "Long term items"

From GlueXWiki
Jump to: navigation, search
 
(30 intermediate revisions by 2 users not shown)
Line 1: Line 1:
# FCAL: Fernando and co. converged on a plan for baserepairs: will take 25 weeks to complete the FCAL repair cycle (342 units) during SAD. (See Fernando's email from Sep 18, 2020.]
+
# Covariance matrices for photons; need pull distributions (Regina could help); add these to best practices page [Mark]
# FCAL: It has been noticed that the pi0 mass shifts when the LED pulser runs at high rate. This is still not understood. See [https://logbooks.jlab.org/entry/3595928 Log Entry 3595928] and references.  Several runs have been taken in raw mode.  These runs exhibit the shift in pi0 mass with LED running at 1 kHz.  There is a need to analyze these to try to determine the cause.  Susan will undertake this task.
+
# BCAL hot channels. Investigate and see if baseline or other improvements are possible; Regina students could help.
##50634 - FCAL Green LED: 1kHz, 29 V, Livetime is 9%, 1.7 M events
+
##50635 - FCAL Violet LED: 1kHz, 22 V, Livetime is 9%, 1.4 M events
+
##50636 - FCAL Blue LED: 1kHz, 15 V, Livetime is 9%, 1.5 M events
+
# Richard Jones' [https://github.com/JeffersonLab/HDGeant4/issues/111#issuecomment-657062174 work on G3vG4]: run photon, pi+, pi-, proton particle guns. Regina will undertake this task.
+

Latest revision as of 18:39, 24 May 2024

  1. Covariance matrices for photons; need pull distributions (Regina could help); add these to best practices page [Mark]
  2. BCAL hot channels. Investigate and see if baseline or other improvements are possible; Regina students could help.