Difference between revisions of "KL Proposal"

From GlueXWiki
Jump to: navigation, search
Line 32: Line 32:
 
- It will probably take 4 weeks for the GlueX Collaboration to review (April-May)
 
- It will probably take 4 weeks for the GlueX Collaboration to review (April-May)
  
- In March, we plan to ask Rolf for a technical review (upon the Jim Napolitano's suggestion)
+
- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion)
  
 
- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.
 
- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.
  
2) We have to make a conceptual design of the KL project which allows to estimate a  
+
2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion).  To do that we have to draw a Note and then ask Eugene to ask Tim to make it.
cost of the KL.  To do that we have to draw a Note and then ask Eugene to ask Tim to make it.
+
  
3) Status of MC simulations of expected data.
+
3) Put the right LH2 target and beamline into GlueX MC.
  
ds/dO for KLp-->K+n (Mikhail)
+
4) Simulate a few K0-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
  
ds/dO and Sigma for KLp-->K+Xi (Nick)
+
-- ds/dO for KLp-->K+n (Mikhail)
  
4) Status of neutron background simulations (Igor)
+
-- ds/dO and Sigma for KLp-->K+Xi (Nick)
  
5) Schedule for the next meeting
+
-- ds/dO for xxx ?
  
6) etc
+
5) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target.
 +
 
 +
6) Status of neutron background simulations (Igor)
 +
 
 +
7) Schedule for the next meeting
 +
 
 +
8) etc

Revision as of 13:26, 29 November 2016

Meetings

We will use Blue Jeans for remote participation.

You can connect to the remote meeting via your browser: https://jlab.bluejeans.com/178535051/

Call-in Directions:

1. Dial: Primary Number: +1-408-740-7256 Toll free number: +1-888-240-2560

2. Enter meeting ID: 178535051

3. Press #

Meeting title: YSTAR2016

International phone numbers are listed on: http://bluejeans.com/numbers


The tentative agenda is

1) Our schedule for the proposal (back in time):

- We may expect that PAC will be scheduled for July.

- We have to submit our proposal 6 weeks in advance (May-June)

- It will probably take 4 weeks for the GlueX Collaboration to review (April-May)

- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion)

- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.

2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it.

3) Put the right LH2 target and beamline into GlueX MC.

4) Simulate a few K0-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.

-- ds/dO for KLp-->K+n (Mikhail)

-- ds/dO and Sigma for KLp-->K+Xi (Nick)

-- ds/dO for xxx ?

5) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target.

6) Status of neutron background simulations (Igor)

7) Schedule for the next meeting

8) etc