Difference between revisions of "KL Minutes 2016"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
* [[December 7th, 2016]]
 
* [[December 7th, 2016]]
  
The tentative agenda:
+
The Agenda:
  
 
1) Our schedule for the proposal (back in time):
 
1) Our schedule for the proposal (back in time):

Revision as of 12:14, 7 December 2016

All meetings in 2016

The Agenda:

1) Our schedule for the proposal (back in time):

- We may expect that PAC will be scheduled for July.

- We have to submit our proposal 6 weeks in advance (May-June).

- It will probably take 4 weeks for the GlueX Collaboration to review (April-May).

- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion).

- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.

2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it.

3) Put the right LH2 target and beamline into GlueX MC.

4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc. Simulate the interactions of the KL and n in the material of the GlueX setup.

5) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.

6) For hyperon spectroscopy

-- ds/dO for KLp-->K+n (Mikhail).

-- ds/dO for KLp-->KSp (Mikhail).

-- ds/dO and Sigma for KLp-->K+Xi (Nick).

-- ds/dO for xxx ?

7) For meson spectroscopy (Volker).

8) CP-violation (Moskov)

9) Status of neutron background simulations (Igor) [[1]]

10) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.

11) Schedule for the next meeting - in a month (January 4th, 2017)