Difference between revisions of "June 21, 2013 Installation"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == Friday, June 21, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, please ...") |
(→Agenda) |
||
Line 21: | Line 21: | ||
# Announcements | # Announcements | ||
− | # Updates to the Mechanical Installation Schedule ([[Media: | + | # Updates to the Mechanical Installation Schedule ([[Media:June 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim) |
# Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]] | # Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]] | ||
# [[Summer 2013 Manpower Contributions |Summer manpower]] | # [[Summer 2013 Manpower Contributions |Summer manpower]] |
Revision as of 13:14, 21 June 2013
Meeting Time and Place
Friday, June 21, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone (supported on request only) dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Up to GlueX/Hall-D Installation Meetings
Action Items From Last Meeting
Agenda
- Announcements
- Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
- Electronics Installation Schedule (Fernando) [| Schedule]
- Summer manpower
- Magnet Status
- Tagger Magnet Installation
- Microscope Installation
- Tagger Array Installation
- Pair Spectrometer Installation
- BCAL Installation
- FCAL Installation
- TOF Installation
- FDC Installation
- CDC Installation
- A.O.B.