Difference between revisions of "June 21, 2013 Installation"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ == Meeting Time and Place == Friday, June 21, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, please ...")
 
(Agenda)
Line 21: Line 21:
  
 
# Announcements
 
# Announcements
# Updates to the Mechanical Installation Schedule ([[Media:Mar 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim)
+
# Updates to the Mechanical Installation Schedule ([[Media:June 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim)
 
# Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
 
# Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
 
# [[Summer 2013 Manpower Contributions |Summer manpower]]
 
# [[Summer 2013 Manpower Contributions |Summer manpower]]

Revision as of 13:14, 21 June 2013

Meeting Time and Place

Friday, June 21, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

Agenda

  1. Announcements
  2. Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
  3. Electronics Installation Schedule (Fernando) [| Schedule]
  4. Summer manpower
  5. Magnet Status
  6. Tagger Magnet Installation
  7. Microscope Installation
  8. Tagger Array Installation
  9. Pair Spectrometer Installation
  10. BCAL Installation
  11. FCAL Installation
  12. TOF Installation
  13. FDC Installation
  14. CDC Installation
  15. A.O.B.