Difference between revisions of "June 11, 2021 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 20: | Line 20: | ||
#* [https://logbooks.jlab.org/entry/3878979 Latest inspections of mirror prototypes] (Bill) | #* [https://logbooks.jlab.org/entry/3878979 Latest inspections of mirror prototypes] (Bill) | ||
#* [https://logbooks.jlab.org/entry/3879783 Mirror production progress] (Justin) | #* [https://logbooks.jlab.org/entry/3879783 Mirror production progress] (Justin) | ||
+ | #* [https://halldweb.jlab.org/DocDB/0035/003581/005/2021_June_11_Diffuser_pattern_check.pdf Diffuser Pattern Check] (Bill) | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status] (Justin) | #* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status] (Justin) |
Revision as of 09:03, 11 June 2021
Meeting Information
GlueX DIRC Meeting
Friday June 11, 2021
10:00 am, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Mirror prototype test plan (All)
- Latest inspections of mirror prototypes (Bill)
- Mirror production progress (Justin)
- Diffuser Pattern Check (Bill)
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status (Justin)
- Geometric reconstruction update (Roman)
- Cherenkov PDF (Ahmed)
- FastDIRC documentation (Yunjie)
- AOB