Difference between revisions of "Jun 4, 2009 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Items for followup from previous meeting)
Line 9: Line 9:
  
 
=Items for followup from previous meeting=
 
=Items for followup from previous meeting=
# Check arrival of Bcal section from Edmonton
+
# <strike> Check arrival of Bcal section from Edmonton <strike>
 
# Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
 
# Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
# Elton to provide reference light guide geometry for GEANT3.
+
# <strike> Elton to provide reference light guide geometry for GEANT3. </strike>
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 17:42, 3 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting

  1. Check arrival of Bcal section from Edmonton <strike>
  2. Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
  3. <strike> Elton to provide reference light guide geometry for GEANT3.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM report
  4. Discussion of readout options
    • Budgets
    • Specifications (See GlueX-doc-1287)
    • FM light guides
    • Mechanical keep-out zones
    • Timeline for review - Reviewer Stefano Miscetti (tentative July 21)
  5. Prototyping
  6. Simulations
    • Sasha will send a link to studies of energy deposition in the Bcal and present his work next time.
    • Andrei will complete simulations of number of visible photons per GeV.
  7. Discussions on MOU with USM

Minutes